What a search actually returns.

At the end of a sourcing brief you get one document: the factories worth talking to, compared on the same terms, with the weak ones removed and the reason written down. Here is one, anonymised.

JR Sourcing · Supplier shortlist
LED desk lamp · RFQ 2148
Anonymised
Client
Importer, Netherlands (name withheld)
Brief date
06 November 2026
Product
LED desk lamp, ABS body, USB-C, EU plug
Target price
US$4.00 per unit at 5,000 pcs
Volume
5,000 pcs, repeat order expected
Delivery terms
FOB Ningbo
Search region
Zhejiang, Guangdong
Prepared by
JR Sourcing · Chengdu
Recommendation: Factory C, Dongguan. 5% above the lowest quote, half the minimum order and eight days faster. Audited in person on 09 November.

The shortlist

Factory Location Unit price MOQ Lead time Status
Factory A Ningbo, Zhejiang $4.20 500 25 days Shortlisted
Factory B Foshan, Guangdong $3.85 1,000 30 days Shortlisted
Factory C Dongguan, Guangdong $4.05 500 22 days Recommended
Supplier D Zhongshan, Guangdong $3.60 300 18 days Rejected

Prices at 5,000 pcs, FOB Ningbo, after first-round negotiation. All four quoted the same specification.

How the field narrowed

Fourteen suppliers were contacted from a market scan and two industry directories. Nine replied, six sent a quotation against the specification, and five passed a licence and export-record check. Four survived a capacity question — the lamp needs in-house injection moulding and an assembly line, not a trading desk with a catalogue.

Why Factory C

  • Owns its moulding and assembly lines; the audit confirmed 11 machines and 140 staff on site.
  • BSCI audited, with a test report for the driver and USB-C board within 18 months.
  • Accepted 30/70 payment with the balance released against the inspection report.
  • Quoted 22 days against 25–30 elsewhere, which matters for a Q1 replenishment.

What was rejected, and why

Supplier D had the lowest price and the shortest lead time, and no factory. The business licence listed a 40 m² office address, the "production line" photographs were reused from a manufacturer's website, and the contact could not name the moulding subcontractor. Removed from the shortlist after a video call.

Factory B remains a valid second source: cheapest per unit, but a 1,000-piece minimum and a 30-day lead time. Worth a sample if the order grows past 10,000.

Next steps

  • Samples from C and B — 2 pcs each, buyer pays cost plus freight.
  • Mould fee confirmed in writing, refundable against 20,000 pcs.
  • Pre-shipment inspection booked at 80% production, AQL 0 / 2.5 / 4.0.
  • Balance released only after the report is accepted.
Illustrative document · names, prices and dates anonymised Prepared by JR Sourcing · jrsourcingchina.com

This is a worked example, not a client's file. The structure, the comparison fields and the reasoning are what every shortlist contains.

Send the product. We'll send the shortlist.

Five to seven working days from brief to document. Free quote first.

WhatsApp
WhatsApp Get a Free Quote